IGEM IGE/UP/9 2004
Application of Natural Gas and fuel oil systems to gas turbines and supplementary and auxiliary fired burners
IGEM IGEM/GM/8 PART 3 2016
Non-domestic meter installations Part 3 : Fabrication, installation, testing and commissioning
IGEM IGEM/TD/101 2009
Adoption of pipe systems by a GT - management of UIP activities
IGEM IGE/GM/8 PART 4 2006
Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar Part 4 : Operat...
IGEM IGE/SR/18 2002
Safe working practices to ensure the integrity of gas pipelines and associated installations
IGEM IGEM/SR/16 2008
Odorant systems for gas transmission and distribution
IGEM IGEM/GM/8 PART 1 2016
Meter installations of flow exceeding 6 m3 per hour Part 1: Design
IGEM IGEM/UP/10 2016
Installation of flued gas appliances in industrial and commercial premises
IGEM IGEM/GL/6 2010
Permitry for the safe flow of gas
IGEM IGEM/GM/8 PART 2 2016
Non-domestic meter installations Part 2 : Location, housings and compounds
Hot Products
IGEM IGEM/GM/8 PART 1 2016
Meter installations of flow exceeding 6 m3 per hour Part 1: Design
IGEM IGEM/SR/28 2011
Trenchless techniques
IGEM IGEM/TD/13 2011
Pressure regulating installations for Natural Gas, Liquefied Petroleum Gas and Liquefied Petroleum Gas/Air
IGEM IGEM/UP/12 2015
Application of burners and controls to gas fired process plant
IGEM IGE/TD/12 2012
Pipework stress analysis for gas industry plant
IGEM IGEM/GM/5 2008
Electronic gas volume conversion systems
IGEM IGE/GM/8 PART 3 2006
Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar Part 3 : Fabric...
IGEM IGEM/G/7 2016
Risk assessment techniques
IGEM IGE/GM/8 PART 5 2005
Non-domestic meter installations. Flow rate exceeding 6 m3h-1 and inlet pressure not exceeding 38 bar Part 5 : Notice...
IGEM IGEM/SR/23 2012
Venting of Natural Gas
IGEM IGEM/GM/8 Part 5 2016
Non-domestic meter installations Part 5 : Notices and labels
IGEM IGEM/UP/10 2016
Installation of flued gas appliances in industrial and commercial premises
IGEM IGEM/G/1 2013
Defining the end of the Network, a meter installation and installation pipework
IGEM IGEM/GM/8 PART 3 2016
Non-domestic meter installations Part 3 : Fabrication, installation, testing and commissioning
IGEM IGE/UP/9 2004
Application of Natural Gas and fuel oil systems to gas turbines and supplementary and auxiliary fired burners
IGEM IGEM/UP/17 2011
Shared chimney and flue systems for domestic gas appliances
IGEM IGEM/G/8 2010
Handling, transport and storage of PE pipes and fittings
IGEM IGEM/SR/14 2009
Fixed volume storage for lighter than air gases
IGEM IGEM/GM/PRS/28 2016
Medium pressure single-stage regulators for gas flow rates not exceeding 6 m3 h-1
IGEM IGEM/UP/1C 2011
Strength testing, tightness testing and direct purging of Natural Gas and LPG meter installations