LUL T0539 2012
Triple-layer single-core abrasion resistant signalling wire - Issue A2
LUL T0538 2012
Specification for electric strip rail heating - Issue A3
LUL T0537 2011
35mm and 70 mmTwo core AC Signal main cable-Non Halogen Low-smoke - Issue A1
LUL T0536 2011
Track Hose for signalling cables - Issue A1
LUL T0535 2011
Air Hose- Low smoke Zero Halogen - Issue A1
LUL T0534 2011
QSEV relay: acceptance tests and performance requirements - Issue A4
LUL T0533 2011
Signal equipment service specification Delta track circuit units Style A, B, C and D - Issue A3
LUL T0532 2011
Clamplock groundlock wiring harness (5 core) 0.6 m long - Issue A3
LUL T0531 2014
Signalling equipment overhaul specification Clamplock point mechanism - Issue A13
LUL T0530 2011
3-core and 5-core screened cables with moulded ends for trackside connections - Issue A4
Hot Products
LUL S2525 2012
Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2
LUL S1105 2013
Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016
LUL G0058 2016
Civil Engineering - Technical Advice Notes - Issue A20
LUL S1093 2016
PMVT Lifts (including managed evacuation lifts) - Issue A5
LUL T0005 2013
Bridges and Structures - Materials and Workmanship - Issue A10
LUL S1180 2015
Standard for Rolling Stock - Issue A6
LUL G2108 2016
Occupational exposure to respirable dust - Issue A1
LUL T0003 2016
Critical Pump Sites _ Control Panel Specification - Issue A1
LUL S1055 2016
Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320: 1/12/2015
LUL WOB3 2011
Train speeds Single line working Wrong direction movements Shunting Trains left on running lines - Issue 4
LUL G1365 2016
Beacon Site - _Achieving Best Practice_ Guidance - Issue A3
LUL S1164 2015
Conductor Rail _ Dimensions and Tolerances - Issue A3
LUL G085 2013
Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the Underground -...
LUL G-073 2011
Electrical Guidance Document - Issue A2
LUL G0111 2013
DC Protection and Commissioning - Issue no: A2
LUL G2120 2016
Examples of updating Waterloo and City line timetables - Issue A1
LUL S1094 2016
Heavy Duty Metro Type Escalators and Moving Walks - Issue A6
LUL S1171 2016
All Plant - Acceptance, Use and Maintenance - Issue A2
LUL R0098 2012
Guidance and material for giving tool box talks - Issue 1
LUL G0115 2014
Civil Engineering Competence Management System Framework - Issue A2