LUL T0509 2011
Signalling equipment overhaul specification 2 position gravity biased relay (style BG) - Issue A5
LUL T0508 2012
Signalling equipment overhaul specification 3 position double element vane relay (WKR) - Issue A6
LUL T0506 2012
Signalling equipment overhaul specification 2-position double element vane relay - Issue A10
LUL T0505 2011
Concentric Signalling Cables - Issue A1
LUL T0504 2011
Cable for d.c. traction indications and rail connections - Issue A1
LUL T0503 2011
Cable, Signalling 3-2 core and 5-2 core concentric, screened, neoprene sheathed with telephone pair - Issue A1
LUL T0502 2011
10 Core Screened Track Crossing Signalling Cable - Issue A1
LUL T0501 2014
Pigtail Rail Connections for Both Underground and Surface Locations - Issue A2
LUL T0500 2013
Track Bonds for Both Underground and Surface Locations - Issue A2
LUL T0450 2012
Performance Specification for Ultrasonic Rail Flaw Detection Equipment - Issue A1
Hot Products
LUL S2525 2012
Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2
LUL S1105 2013
Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016
LUL G0058 2016
Civil Engineering - Technical Advice Notes - Issue A20
LUL S1093 2016
PMVT Lifts (including managed evacuation lifts) - Issue A5
LUL T0005 2013
Bridges and Structures - Materials and Workmanship - Issue A10
LUL S1180 2015
Standard for Rolling Stock - Issue A6
LUL G2108 2016
Occupational exposure to respirable dust - Issue A1
LUL S1055 2016
Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320: 1/12/2015
LUL T0003 2016
Critical Pump Sites _ Control Panel Specification - Issue A1
LUL WOB3 2011
Train speeds Single line working Wrong direction movements Shunting Trains left on running lines - Issue 4
LUL G1365 2016
Beacon Site - _Achieving Best Practice_ Guidance - Issue A3
LUL S1164 2015
Conductor Rail _ Dimensions and Tolerances - Issue A3
LUL G085 2013
Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the Underground -...
LUL G-073 2011
Electrical Guidance Document - Issue A2
LUL G2120 2016
Examples of updating Waterloo and City line timetables - Issue A1
LUL G0111 2013
DC Protection and Commissioning - Issue no: A2
LUL S1094 2016
Heavy Duty Metro Type Escalators and Moving Walks - Issue A6
LUL S1171 2016
All Plant - Acceptance, Use and Maintenance - Issue A2
LUL R0098 2012
Guidance and material for giving tool box talks - Issue 1
LUL G0115 2014
Civil Engineering Competence Management System Framework - Issue A2