LUL S1126 2013
Batteries and Chargers for Fixed Power Supply Installations in Non-Substation Locations - Issue A2
LUL S1121 2011
Cables: Electric, Data and Fibre Optic - Issue A2
LUL S1120 2011
Power Cable Route Design, Testing and Recovery Requirements - Issue A4
LUL S1116 2011
NULL
LUL S1115 2011
Performance and Maintenance of Current Rail Indicator Device (CRID) - Issue A2
LUL S1114 2011
Safe Systems of Work on or Near Electrical Equipment - Issue A2
LUL S1111 2013
DC Protection and Commissioning - Issue A4
LUL S1110 2012
AC Electrical Protection Requirements - Issue A2
LUL S1109 2011
Switchgear and Ancillary Equipment - Issue A2
LUL S1108 2012
DC Traction Feeder Cables - Issue A3
Hot Products
LUL S2525 2012
Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2
LUL S1105 2013
Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016
LUL G0058 2016
Civil Engineering - Technical Advice Notes - Issue A20
LUL T0005 2013
Bridges and Structures - Materials and Workmanship - Issue A10
LUL S1180 2015
Standard for Rolling Stock - Issue A6
LUL S1093 2016
PMVT Lifts (including managed evacuation lifts) - Issue A5
LUL G2108 2016
Occupational exposure to respirable dust - Issue A1
LUL S1055 2016
Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320: 1/12/2015
LUL WOB3 2011
Train speeds Single line working Wrong direction movements Shunting Trains left on running lines - Issue 4
LUL G085 2013
Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the Underground -...
LUL T0003 2016
Critical Pump Sites _ Control Panel Specification - Issue A1
LUL S1164 2015
Conductor Rail _ Dimensions and Tolerances - Issue A3
LUL G1365 2016
Beacon Site - _Achieving Best Practice_ Guidance - Issue A3
LUL G0111 2013
DC Protection and Commissioning - Issue no: A2
LUL G2120 2016
Examples of updating Waterloo and City line timetables - Issue A1
LUL G-073 2011
Electrical Guidance Document - Issue A2
LUL S1171 2016
All Plant - Acceptance, Use and Maintenance - Issue A2
LUL S1094 2016
Heavy Duty Metro Type Escalators and Moving Walks - Issue A6
LUL R0098 2012
Guidance and material for giving tool box talks - Issue 1
LUL G0115 2014
Civil Engineering Competence Management System Framework - Issue A2