LUL 1-169 2011
Train Arrestors _ Performance, Design and Configuration - Issue A2; Incorporating Written Notice: 3/14/2014
LUL 1-164 2011
Conductor Rail _ Dimensions and Tolerances - Issue A2; Incorporating Written Notice: 11/13/2013; 01/31/2014; 03/14/20...
LUL 1-150 2011
Telecommunications - OPO CCTV - Issue A1; Incorporating Written Notice: 9/9/2011
LUL 1-142 2011
Operational Information Systems - Issue A4; Incorporating Written Notice: 11/14/2011; 7/8/2013
LUL 1-133 2010
Premises - stairways and ramps - Issue A8
LUL 1-124 2010
Low Voltage AC and DC Power Supply Parameters, Characteristics and Performance Requirements - Issue A1
LUL 1-123 2010
Requirements for Matching Electrical Loads to Supplies when making changes to Low Voltage Infrastructure - Issue A2; ...
LUL 1-122 2010
Requirements for 750V Traction Power Supplies and Insulation Levels - Issue A1; Includes Written Notice 6/12/2015
LUL 1-107 2015
Requirements for Electrical Track Equipment - Issue A3
LUL 1-085 2011
Fire safety performance of materials - Issue A3; Incorporating Written Notice: 10/13/2014
Hot Products
LUL S2525 2012
Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2
LUL S1105 2013
Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016
LUL G0058 2016
Civil Engineering - Technical Advice Notes - Issue A20
LUL T0005 2013
Bridges and Structures - Materials and Workmanship - Issue A10
LUL S1180 2015
Standard for Rolling Stock - Issue A6
LUL S1093 2016
PMVT Lifts (including managed evacuation lifts) - Issue A5
LUL G2108 2016
Occupational exposure to respirable dust - Issue A1
LUL S1055 2016
Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320: 1/12/2015
LUL WOB3 2011
Train speeds Single line working Wrong direction movements Shunting Trains left on running lines - Issue 4
LUL G085 2013
Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the Underground -...
LUL T0003 2016
Critical Pump Sites _ Control Panel Specification - Issue A1
LUL S1164 2015
Conductor Rail _ Dimensions and Tolerances - Issue A3
LUL G1365 2016
Beacon Site - _Achieving Best Practice_ Guidance - Issue A3
LUL G0111 2013
DC Protection and Commissioning - Issue no: A2
LUL G2120 2016
Examples of updating Waterloo and City line timetables - Issue A1
LUL G-073 2011
Electrical Guidance Document - Issue A2
LUL S1094 2016
Heavy Duty Metro Type Escalators and Moving Walks - Issue A6
LUL S1171 2016
All Plant - Acceptance, Use and Maintenance - Issue A2
LUL R0098 2012
Guidance and material for giving tool box talks - Issue 1
LUL G0115 2014
Civil Engineering Competence Management System Framework - Issue A2