NG CH 02 2011
Commissioning Handbook - Model Switching Programme - Issue 2
NG SCT 20.17.03 1998
Site Commissioning Tests - REL 350 (MSPC) Phase Comparison Protection Relay - Issue 2
NG TGN(E) 192 2018
Technical Guidance Notes - CREATION OF PLS TOWER MODELS - Issue 2
NG UKBP/TP 135 2015
UK Business Procedure/Transmission Procedures - Management of Drawings (Electricity Assets) - Issue 7
NG TS 3.24.95 2012
Technical Specifications - Ancillary Services Business Monitoring - Issue 1
NG SCT 16 1998
Site Commissioning Tests - 132 kV Combined Voltage and Current (VT/CT) Transformers for Tariff Metering - Issue 3
NG TS 2.32 2016
Technical Specifications - Statcom for Connection to 275kV and 400kV Systems - Issue 1
NG TGN(E) 212 2015
Technical Guidance Notes - National Grid Protection Application and Setting at Railway Suppy Points - Issue 3
NG SCT 11 1998
Site Commissioning Tests - Switching and Transforming Stations 415 V A.C. Switchboard - Issue 2
NG TS 3.24.22 2013
Technical Specifications - Ethernet Network Hardware for Substation Systems - Issue 1
Hot Products
NG TGN(E) 026 2001
Technical Guidance Notes - Current Ratings for Overhead Lines - Issue 3
NG TS 3.24.42 2001
National Grid Technical Specifications - Automatic Reactive Switching for HV and LV Shunt Reactive Plant - Issue 1
NG SCT 44 1998
Site Commissioning Tests - Nokia V.33 Modem, GI74 Multiplexer and Associated Communications Equipment - Issue 2
NG UKBP/TP 137 2016
UK Business Procedure/Transmission Procedures - The Implementation of Construction (Design & Management) Regulations ...
NG DH 10 2013
Design Handbook - Electricity Substation Construction Civil, Structural and Building Engineering - Issue 4
NG TS 3.10.00 2010
Technical Specifications - Generic Technical Specifications - for Civil, Structural and Building Engineering - Introd...
NG TS 3.10.02 2010
Technical Specifications - Generic Technical Specifications - for Civil, Structural and Building Engineering - Materi...
NG NGUK/CD/BP 210E 2012
UK Capital Delivery Business Procedures - Environmental Requirements for Construction Pojects - Issue 2a
NG TS 3.24.25 2016
Technical Specifications - IEC 61850 Configuration - Issue 1
NG SB(T) 023 2012
Strategy Briefs - Use of Crushed Concrete - Issue 1
NG CH 24 2009
Commissioning Handbook - Installation & Commissioning of Numerical Busbar Protection - Issue 2
NG DH 01 2014
Design Handbook - Application Guidance Notes for The New Build & Asset Replacement of Transmission System Protection ...
NG TS 3.05.07 2011
Technical Specifications - Installation Requirements for Power and Auxiliary Cable - Issue 7
NG TGN(E) 200 2018
Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects - Issue 7
NG UKBP/TP 107 2014
UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings - Issue 11
NG TS 3.04.35 2017
Technical Specifications - Components For Overhead Lines - Issue 2
NG TS 3.02.04 2015
National Grid Technical Specifications - Current Transformers for Protection and General Use - Issue 6
NG SCT 20.12.06 1998
Site Commissioning Tests - Reyrolle THR Distance Protection - Issue 3
NG TS 3.01.04 ADD 1 2013
Technical Specifications - Busbar Systems for AIS Substations - Issue 2
NG TR(E) 399 2003
Technical Reports - Effectiveness of National Grid Transco Cable Cooling Systems - Issue 1