NG TGN(E) 285 2016
Technical Guidance Note - Laser Scan to Revit Modelling Standards - Existing Conditions for Electricity Transmission ...
NG TS 2.19 2005
Technical Specifications - Ancillary Light Current Equipment - Issue 3; Incorporating Addendum No. 2: 7/2010
NG SCT 16.03 2004
Site Commissioning Tests - Installation Contractor Commissioning of 3-Phase 4-Wire Settlement Metering - Issue 4
NG TS 2.10.14 2016
Technical Specifications - Technical Security Specifications for Integrated Security Solution Sites - Issue 2
NG DH 24 2014
Design Handbook - Guidance for Engineering Assurance Engineers - Issue 2
NG TGN(E) 133 1998
Technical Guidance Notes - Protection Against Rise of Earth Potential and Induced Voltages on Telecommunication Cable...
NG CH 23 2005
Commissioning Handbook - Stage 1 & Stage 2 Commissioning Tests for Mechanically Switched Capacitor Installations - Is...
NG SCT 30.02 1998
Site Commissioning Tests - Cegelec T5000 Automatic Voltage Control (AVC) System - Issue 2
NG SCT 20.12.09 1998
Site Commissioning Tests - GEC Alsthom OPTIMHO (LFZP) Distance Protection - Issue 2
NG TS 3.24.81 2012
Technical Specifications - Iec 60870-5-101 Communications Protocol - Issue 4
Hot Products
NG TGN(E) 026 2001
Technical Guidance Notes - Current Ratings for Overhead Lines - Issue 3
NG SCT 44 1998
Site Commissioning Tests - Nokia V.33 Modem, GI74 Multiplexer and Associated Communications Equipment - Issue 2
NG TS 3.24.42 2001
National Grid Technical Specifications - Automatic Reactive Switching for HV and LV Shunt Reactive Plant - Issue 1
NG UKBP/TP 137 2016
UK Business Procedure/Transmission Procedures - The Implementation of Construction (Design & Management) Regulations ...
NG TS 3.10.02 2010
Technical Specifications - Generic Technical Specifications - for Civil, Structural and Building Engineering - Materi...
NG TS 3.10.00 2010
Technical Specifications - Generic Technical Specifications - for Civil, Structural and Building Engineering - Introd...
NG DH 10 2013
Design Handbook - Electricity Substation Construction Civil, Structural and Building Engineering - Issue 4
NG NGUK/CD/BP 210E 2012
UK Capital Delivery Business Procedures - Environmental Requirements for Construction Pojects - Issue 2a
NG TS 3.24.25 2016
Technical Specifications - IEC 61850 Configuration - Issue 1
NG SB(T) 023 2012
Strategy Briefs - Use of Crushed Concrete - Issue 1
NG CH 24 2009
Commissioning Handbook - Installation & Commissioning of Numerical Busbar Protection - Issue 2
NG DH 01 2014
Design Handbook - Application Guidance Notes for The New Build & Asset Replacement of Transmission System Protection ...
NG TS 3.05.07 2011
Technical Specifications - Installation Requirements for Power and Auxiliary Cable - Issue 7
NG TS 3.04.35 2017
Technical Specifications - Components For Overhead Lines - Issue 2
NG TGN(E) 200 2018
Technical Guidance Notes - Timescales and Techniques for The Rectification of Overhead Line Defects - Issue 7
NG UKBP/TP 107 2014
UK Business Procedure/Transmission Procedures - Protection and Control Relay Settings - Issue 11
NG SCT 20.12.06 1998
Site Commissioning Tests - Reyrolle THR Distance Protection - Issue 3
NG TS 3.02.04 2015
National Grid Technical Specifications - Current Transformers for Protection and General Use - Issue 6
NG TS 3.01.04 ADD 1 2013
Technical Specifications - Busbar Systems for AIS Substations - Issue 2
NG TR(E) 399 2003
Technical Reports - Effectiveness of National Grid Transco Cable Cooling Systems - Issue 1