TOTAL GS EP SAF 321 2015
FIRE PUMP STATIONS AND FIRE WATER MAINS
TOTAL GS EP SAF 312 2016
FIRE AND GAS DETECTION SYSTEMS
TOTAL GS EP SAF 311 2015
RULES FOR THE SELECTION OF FIRE-FIGHTING SYSTEMS
TOTAL GS EP SAF 262 2015
PRESSURE PROTECTION RELIEF AND HYDROCARBON DISPOSAL SYSTEMS
TOTAL GS EP SAF 261 2016
EMERGENCY SHUTDOWN AND EMERGENCY DE-PRESSURISATION (ESD & EDP)
TOTAL GS EP SAF 260 2017
DESIGN OF HIGH INTEGRITY PROTECTION SYSTEMS (HIPS)
TOTAL GS EP SAF 253 2016
IMPACTED AREA, RESTRICTED AREA AND FIRE ZONES
TOTAL GS EP SAF 228 2016
LIQUID DRAINAGE
TOTAL GS EP SAF 227 2015
SAFETY RULES FOR FIRED HEATERS
TOTAL GS EP SAF 222 2015
SAFETY REQUIREMENTS FOR TURBINES, DIESEL ENGINES, GAS ENGINES AND PROCESS UNITS IN SHELTERED OR ENCLOSED AREAS
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES