TOTAL GS EP PVV 119 2015
DESIGN AND FABRICATION OF METALLIC PIPING SUPPORTS - STANDARD FOR PIPING SUPPORTS
TOTAL GS EP PVV 111 2015
PIPING DESIGN SPECIFICATION
TOTAL GS EP PVV 107 2017
PIPING STRESS ANALYSIS
TOTAL GS EP PVV 101 2015
LIST OF PIPING DOCUMENTS TO BE SUPPLIED TO TOTAL
TOTAL GS EP PVV 001 2015
CORRESPONDENCE BETWEEN ELF AND TOTAL PIPING MATERIAL CLASSES
TOTAL GS EP POS 009 2015
POSITIONING REPRESENTATIVES
TOTAL GS EP POS 008 2015
AERIAL PHOTOGRAMMETRIC SURVEY
TOTAL GS EP POS 007 2015
AIRBORNE LASER SCANNING SURVEY (LIDAR)
TOTAL GS EP POS 002 2016
SUBSEA POSITIONING WORKS
TOTAL GS EP POS 001 2015
OFFSHORE SURFACE POSITIONING WORKS
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES