TOTAL GS EP INS 101 2018
INSTRUMENTATION ENGINEERING, SUPPLY AND CONSTRUCTION GENERAL REQUIREMENTS
TOTAL GS EP INS 100 2016
Overall Instrumentation Philosophy
TOTAL GS EP INS 000 2015
MINIMUM CONTRACTOR DOCUMENT REQUIREMENTS
TOTAL GS EP INF 001 2018
Geographic Information Systems technical architecture
TOTAL GS EP ICS 004 2019
3D CAD Models
TOTAL GS EP ICS 003 2019
Numbering of wells, facilities, equipment and documents at project definition phase
TOTAL GS EP ICS 001 2019
2D CAD Layouts
TOTAL GS EP GSR 101 2016
Sampling and inorganic analysis of waters from aquifers and hydrocarbon reservoirs
TOTAL GS EP GSR 013 2017
Preparing and managing Geoscience and Reservoir field activities
TOTAL GS EP GPY 304 2017
Land Magnetotelluric acquisition
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES