TOTAL GS EP GEO 214 2015
ONSHORE GEOPHYSICAL SITE SURVEY - ELECTRIC GEOPHYSICAL SURVEY
TOTAL GS EP GEO 213 2015
ONSHORE GEOPHYSICAL SITE SURVEY - MICRO-GRAVITY GEOPHYSICAL SURVEY
TOTAL GS EP GEO 212 2015
ONSHORE GEOPHYSICAL SITE SURVEY MULTICHANNEL SURFACE WAVES GEOPHYSICAL SURVEY
TOTAL GS EP GEO 211 2015
ONSHORE GEOPHYSICAL SITE SURVEY SEISMIC REFRACTION GEOPHYSICAL SURVEY
TOTAL GS EP GEO 210 2015
ONSHORE GEOPHYSICAL SITE SURVEY CROSS HOLE GEOPHYSICAL SURVEY
TOTAL GS EP GEO 207 2015
ROV Seabed Survey
TOTAL GS EP GEO 206 2015
Seabed Sampling for geochemical, heat flow and biostratigraphic analysis - SGE
TOTAL GS EP GEO 204 2015
GEOPHYSICAL DEBRIS SURVEY
TOTAL GS EP GEO 203 2015
GEOPHYSICAL SURVEY FOR OFFSHORE PIPELINE INSPECTION
TOTAL GS EP GEO 202 2015
GEOPHYSICAL SURVEY FOR THE INSTALLATION AND/OR THE INSPECTION OF OFFSHORE STRUCTURES AND PIPELINES
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES