TOTAL GS EP TEL 140 2012
PUBLIC ADDRESS AND GENERAL ALARM (PAGA)
TOTAL GS EP TEL 133 2012
TRUNKED RADIO NETWORKS
TOTAL GS EP TEL 130 2011
MARINE AND AIR/GROUND RADIO LINKS
TOTAL GS EP TEL 121 2009
POINT TO MULTIPOINT RADIO NETWORK
TOTAL GS EP TEL 120 2009
POINT TO POINT MICROWAVE LINKS
TOTAL GS EP TEL 111 2012
DESIGN AND INSTALLATION OF AN IP TELEPHONY SYSTEM
TOTAL GS EP TEL 110 2009
DESIGN AND INSTALLATION OF PBX
TOTAL GS EP TEL 002 2012
TELECOM SHUTDOWN PHILOSOPHY
TOTAL GS EP STR 902 2012
PULTRUTED FIRE RESISTANT FIBRE REINFORCED PLASTIC FLOOR GRATING
TOTAL GS EP STR 901 2012
DESIGN RULES AND CONSTRUCTION STANDARDS FOR ANCILLARY STRUCTURES OF OFFSHORE INSTALLATIONS
Hot Products
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES