TOTAL GS EP PVV 613 2006
VALVES MATERIALS REQUIREMENTS FOR USE IN SOUR SERVICE
TOTAL GS EP PVV 612 2012
PIPING AND EQUIPMENT SUBJECT TO SEVERE SOUR SERVICE. METALLURGICAL AND WELDING REQUIREMENTS
TOTAL GS EP PVV 611 2009
WELDING OF PRESSURE CONTAINING PIPING AND EQUIPMENT
TOTAL GS EP PVV 441 2005
PROCEDURE FOR SHOP HYDRAULIC TESTS OF SHELL AND TUBE HEAT EXCHANGERS
TOTAL GS EP PVV 415 2012
DESIGN AND FABRICATION OF AIR COOLER
TOTAL GS EP PVV 414 2009
DOUBLE PIPE HEAT EXCHANGERS
TOTAL GS EP PVV <em>412</em> 2012
PLATE AND FRAME HEAT EXCHANGER
TOTAL GS EP PVV 411 2012
SHELL AND TUBE HEAT EXCHANGERS
TOTAL GS EP PVV 402 2005
STANDARDS FOR EXCHANGER ACCESSORIES AND EQUIPMENT
TOTAL GS EP PVV 315 2009
DESIGN AND CONSTRUCTION OF LARGE LPG STORAGE TANKS
Hot Products
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy