TOTAL GS EP HVA 204 2008
ANTI-BLAST DAMPER(S)
TOTAL GS EP HVA 100 2012
HVAC BASIS OF DESIGN
TOTAL GS EP HVA 010 2009
SELECTION OF STAINLESS STEEL GRADE FOR HVAC EQUIPMENT
TOTAL GS EP HVA 000 2012
LIST OF HVAC SPECIFICATIONS
TOTAL GS EP GSR 003 2012
INSTRUCTIONS FOR EXPEDITION OF FLUID SAMPLES AT ATMOSPHERIC CONDITIONS AND IN SMALL TANK VOLUMES
TOTAL GS EP GSR 002 2012
INSTRUCTIONS FOR EXPEDITION OF PRESSURISED FLUIDS
TOTAL GS EP GPA 203 2012
SEISMIC HSE FOR SHALLOW WATER AND TRANSITION ZONE ACTIVITIES
TOTAL GS EP GPA 202 2012
SEISMIC HSE FOR LAND ACTIVITIES
TOTAL GS EP GPA 201 2012
SEISMIC HSE FOR MARINE ACTIVITIES
TOTAL GS EP GLG 301 2003
GWD : GAS WHILE DRILLING ACQUISITION AND INTERPRETATION
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy