TOTAL GS EP EXP 135 2012
FULL CONTROL OF WELLS (FCW) SPECIFICATION
TOTAL GS EP EXP 131 2012
DESIGN AND INSTALLATION OF PROCESS DATA SERVER
TOTAL GS EP ELE 460 2012
ENGINEERING STUDIES
TOTAL GS EP ELE 451 2008
THIRD PARTY INSPECTION INDEPENDENT VERIFICATION OF ELECTRICAL FACILITIES
TOTAL GS EP ELE 374 2012
CONSTRUCTION SITE ELECTRICAL INSTALLATIONS
TOTAL GS EP ELE 331 2012
TAPE TRACE HEATING
TOTAL GS EP ELE 321 2012
NAVIGATIONAL AIDS SYSTEM
TOTAL GS EP ELE 311 2012
CABLE TRAYS/LADDERS
TOTAL GS EP ELE 261 2012
SOLAR POWER SYSTEM
TOTAL GS EP ELE 251 2012
CLOSED CYCLE VAPOUR TURBOGENERATOR (CCVT)
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy