TOTAL GS EP SPS 031 2016
Chemical Injection Throttling Valves
TOTAL GS EP SPS 030 2015
OBSERVATION ROV SPREAD MINIMUM REQUIREMENTS
TOTAL GS EP SPS 029 2017
METALLIC MATERIALS FOR SUBSEA PRODUCTION FACILITIES
TOTAL GS EP SPS 028 2015
OBSOLESCENCE MANAGEMENT PLAN FOR SUBSEA PRODUCTION CONTROL SYSTEM
TOTAL GS EP SPS 027 2015
WOROV SPREAD MINIMUM REQUIREMENTS
TOTAL GS EP SPS 025 2015
SUBSEA HYDRAULIC SPRING RETURN QUARTER TURN ACTUATORS
TOTAL GS EP SPS 024 2015
SUBSEA MECHANICAL QUARTER TURN ACTUATOR (MANUALLY OPERATED GEARBOX)
TOTAL GS EP SPS 023 2015
CLEANING AND FLUSHING OF HYDRAULIC SYSTEMS
TOTAL GS EP SPS 019 2016
SUBSEA PRODUCTION CONTROL SYSTEM
TOTAL GS EP SPS 018 2018
SUBSEA MULTIPHASE FLOW METER
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES