TOTAL GS EP PJC 302 2005
WORKS STATUS METHODOLOGY
TOTAL GS EP PJC 301 2005
HOOK-UP ORGANIZATION AND PREPARATION
TOTAL GS EP MED 063 2009
SPECIFIC RISKS: CLINICAL AND THERAPEUTIC ELEMENTS
TOTAL GS EP MED 062 2009
HYGIENE IN BASES AND LIVING QUARTERS
TOTAL GS EP MED 061 2009
MEDICAL SUPPORT FOR E&P SITES
TOTAL GS EP MED 060 2009
ONSITE MEDICAL STRUCTURES
TOTAL GS EP MEC 300 2012
NOISE AND VIBRATION OF ROTATING MACHINE PACKAGES
TOTAL GS EP MEC 292 2012
ROTATING MACHINES PACKAGES INSTALLATION REQUIREMENTS
TOTAL GS EP MEC 281 2012
LUBRICATION, SHAFT SEALING, AND OIL CONTROL SYSTEMS AND AUXILIARIES ACCORDING TO ISO 10438 / API STANDARD 614
TOTAL GS EP MEC 275 2012
MULTI-PHASE PUMPS
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy