TOTAL GS EP LSO 410 2009
MANNED UNDERWATER OPERATIONS
TOTAL GS EP LSO 306 2011
SELECTION AND OPERATION OF DYNAMICALLY POSITIONED VESSELS
TOTAL GS EP LSO 209 2012
LIFE JACKETS & IMMERSION SUITS SPECIFICATIONS
TOTAL GS EP LSO 207 2012
NOTICES TO MARINERS AND RESTRICTED NAVIGATION ZONE
TOTAL GS EP LSO 206 2011
ELECTRONIC SURVEILLANCE AIDS
TOTAL GS EP LSO 205 2011
TANKER LOADING AND OFFLOADING MARINE PROCEDURES
TOTAL GS EP LSO 204 2011
MARINE BERTHING AIDS FOR COASTAL AND OFFSHORE TERMINALS
TOTAL GS EP LSO 203 2012
TERMINAL PILOTS _ TERMINAL TUG MASTER: QUALIFICATION, CERTIFICATION AND TRAINING
TOTAL GS EP LSO 202 2011
PERSONNEL TRANSFER BETWEEN WATERCRAFTS AND BETWEEN WATERCRAFTS AND OFFSHORE STRUCTURES
TOTAL GS EP LSO 201 2012
TOWING FLOATING UNIT
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy