TOTAL GS EP INS 150 2012
DESIGN METHOD FOR SYSTEM CONFIGURATION - STANDARD FUNCTIONS
TOTAL GS EP INS 147 2012
DESIGN AND SUPPLY OF WELLHEAD CONTROL PANELS
TOTAL GS EP INS 146 2012
DESIGN OF GENERATION AND DISTRIBUTION OF HYDRAULIC ENERGY
TOTAL GS EP INS 135 2012
CYBER SECURITY REQUIREMENTS FOR DESIGN AND SUPPLY OF ICSS AND PACKAGE SYSTEMS
TOTAL GS EP INS 134 2012
DESIGN AND SUPPLY OF INTEGRATED CONTROL AND SAFETY SYSTEM
TOTAL GS EP INS 131 2012
STANDARD FUNCTIONS AND FUNCTIONAL ANALYSIS DEVELOPMENT REQUIREMENTS
TOTAL GS EP INS 125 2012
SAFETY RELIEF VALVES AND RUPTURE DISCS
TOTAL GS EP INS 120 2012
CONTROL AND CHOKE VALVES
TOTAL GS EP INS 112 2012
DESIGN AND SUPPLY OF GAS CUSTODY TRANSFER METERING UNITS
TOTAL GS EP INS 111 2012
DESIGN AND SUPPLY OF LIQUID CUSTODY TRANSFER METERING UNITS
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy