LUL S1950 2013
Acoustic Hoods for Use on Rotating Frequency Changers - Issue A1
LUL S1949 2013
Specification for 110 V Control and 116 V Starting Batteries and Chargers for Use on The System at Greenwich Power St...
LUL S1948 2013
Battery Backed Power Supply Equipment for Local Emergency Power Supplies - Issue A1
LUL S1947 2013
50 and 110 V DC Supplies From Batteries and Chargers for Use on The System - Issue A1
LUL S1946 2013
Requirements for Stationary Compressed Air Equipment in Traction Substations - Issue A1
LUL S1945 2013
Acoustic Screening for Transformers for Use on The System - Issue A1
LUL S1944 2013
22kV and 11kV Three Phase Earthing Reactors and Earthing Auxiliary Transformers for Use on The System - Issue A1
LUL S1943 2013
22/11kV Three Phase Power Transformers for Use on The System - Issue A1
LUL S1942 2013
22 kV/433 V and 11 kV/433 V Three Phase Auxiliary Transformers for Use on The System - 8/2013
LUL S1941 2013
400 V Nominal A.C. and 600 V Signal Indoor Switchboards for Use on The System - Issue A1
Hot Products
LUL S2525 2012
Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2
LUL S1105 2013
Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016
LUL G0058 2016
Civil Engineering - Technical Advice Notes - Issue A20
LUL T0005 2013
Bridges and Structures - Materials and Workmanship - Issue A10
LUL S1180 2015
Standard for Rolling Stock - Issue A6
LUL S1093 2016
PMVT Lifts (including managed evacuation lifts) - Issue A5
LUL G2108 2016
Occupational exposure to respirable dust - Issue A1
LUL S1055 2016
Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320: 1/12/2015
LUL WOB3 2011
Train speeds Single line working Wrong direction movements Shunting Trains left on running lines - Issue 4
LUL G085 2013
Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the Underground -...
LUL T0003 2016
Critical Pump Sites _ Control Panel Specification - Issue A1
LUL S1164 2015
Conductor Rail _ Dimensions and Tolerances - Issue A3
LUL G1365 2016
Beacon Site - _Achieving Best Practice_ Guidance - Issue A3
LUL G0111 2013
DC Protection and Commissioning - Issue no: A2
LUL G2120 2016
Examples of updating Waterloo and City line timetables - Issue A1
LUL G-073 2011
Electrical Guidance Document - Issue A2
LUL S1171 2016
All Plant - Acceptance, Use and Maintenance - Issue A2
LUL S1094 2016
Heavy Duty Metro Type Escalators and Moving Walks - Issue A6
LUL R0098 2012
Guidance and material for giving tool box talks - Issue 1
LUL G0115 2014
Civil Engineering Competence Management System Framework - Issue A2