LUL S1940 2013
630/750 V Direct Current Indoor Switchboards for Use on The System - Issue A1
LUL S1939 2013
High Voltage A.C. Indoor Switchboards up to 36kV for Use on The System - Issue A1; Includes Written Notice 7/23/2015
LUL S1938 2013
Cabling/Wiring Management Systems using Trunking, Tray and Conduit for Use on The System - Issue A1
LUL S1937 2013
Pilot Boxes and Cable Terminations for Pilot Cables for Use on The System - Issue A1
LUL S1936 2013
1.5 to 935 mm2 Single Core, 450/750 V, Unarmoured Sheathed and Unsheathed Cables for Use on The System - Issue A1
LUL S1935 2013
50 to 1000 mm2 Single and 1.5 to 400 mm2 Multi-core, 600/1000 V, Armoured Cables for Use on The System - Issue A1
LUL S1934 2013
Power Cable Accessories for Use on The System - Issue A1
LUL S1933 2013
Paper Insulated Lead Sheathed Power Cables for Rated Line Voltages of 11kV for Use on The System - Issue A1
LUL S1932 2013
Pilot Cables and Accessories for Use on The System - Issue A1
LUL S1931 2013
Power Cables for Rated Voltages from 3.8/6.6 kV up to 19/33 kV for Use on The System (formerly Powerlink Technical Sp...
Hot Products
LUL S2525 2012
Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2
LUL S1105 2013
Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016
LUL G0058 2016
Civil Engineering - Technical Advice Notes - Issue A20
LUL T0005 2013
Bridges and Structures - Materials and Workmanship - Issue A10
LUL S1180 2015
Standard for Rolling Stock - Issue A6
LUL S1093 2016
PMVT Lifts (including managed evacuation lifts) - Issue A5
LUL G2108 2016
Occupational exposure to respirable dust - Issue A1
LUL S1055 2016
Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320: 1/12/2015
LUL WOB3 2011
Train speeds Single line working Wrong direction movements Shunting Trains left on running lines - Issue 4
LUL G085 2013
Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the Underground -...
LUL T0003 2016
Critical Pump Sites _ Control Panel Specification - Issue A1
LUL S1164 2015
Conductor Rail _ Dimensions and Tolerances - Issue A3
LUL G1365 2016
Beacon Site - _Achieving Best Practice_ Guidance - Issue A3
LUL G0111 2013
DC Protection and Commissioning - Issue no: A2
LUL G2120 2016
Examples of updating Waterloo and City line timetables - Issue A1
LUL G-073 2011
Electrical Guidance Document - Issue A2
LUL S1171 2016
All Plant - Acceptance, Use and Maintenance - Issue A2
LUL S1094 2016
Heavy Duty Metro Type Escalators and Moving Walks - Issue A6
LUL R0098 2012
Guidance and material for giving tool box talks - Issue 1
LUL G0115 2014
Civil Engineering Competence Management System Framework - Issue A2