LUL S1930 2013
Traction Converter Groups for Use on The System (formerly Powerlink Technical Specification SP80101 Rev 2) - Issue A1
LUL S1926 2015
Design, Manufacture, Testing and Maintenance of Short-Circuiting Devices - Issue A1
LUL S1922 2015
Requirements for Electrical Track Equipment - Issue A1; Incorporated Written Notice: 4/22/2016
LUL S1916 2013
Physical and Electrical Environment of The System (formerly Powerlink Technical Specification SP82603 Rev 1) - Issue A1
LUL S1915 2013
Specification for the Requirements for Substations and Other Similar Buildings for Use on the System (formerly Powerl...
LUL S1914 2013
Specification for Requirements for Domestic Electrical Installations in Substations for Use on The System (formerly P...
LUL S1913 2013
Common and General Requirements for Fixed Installation Power Supply Equipment (formerly Powerlink Technical Specifica...
LUL S1900 2014
Quality Inspection Completion Certificate - Issue A1; Includes Written Notice 6/2/2015
LUL S1801 2015
Competence requirements for undertaking Civil Engineering Safety Critical Work - Issue A1
LUL S1800 2013
Cable Runs - Issue A2
Hot Products
LUL S2525 2012
Signalling Installation Handbook - Issue A3; Includes S&CSEST0021 A2
LUL S1105 2013
Power Service Contract - Performance Specification - Issue A4; Includes Written Notice 2/12/2016
LUL G0058 2016
Civil Engineering - Technical Advice Notes - Issue A20
LUL T0005 2013
Bridges and Structures - Materials and Workmanship - Issue A10
LUL S1180 2015
Standard for Rolling Stock - Issue A6
LUL S1093 2016
PMVT Lifts (including managed evacuation lifts) - Issue A5
LUL G2108 2016
Occupational exposure to respirable dust - Issue A1
LUL S1055 2016
Civil Engineering _ Deep Tube Tunnels and Shafts - Issue A3; Includes Written Notice 01320: 1/12/2015
LUL WOB3 2011
Train speeds Single line working Wrong direction movements Shunting Trains left on running lines - Issue 4
LUL G085 2013
Code of practice - Fire Safety of Materials and Fire Safety of Specific Items and Materials Used in the Underground -...
LUL T0003 2016
Critical Pump Sites _ Control Panel Specification - Issue A1
LUL S1164 2015
Conductor Rail _ Dimensions and Tolerances - Issue A3
LUL G1365 2016
Beacon Site - _Achieving Best Practice_ Guidance - Issue A3
LUL G0111 2013
DC Protection and Commissioning - Issue no: A2
LUL G2120 2016
Examples of updating Waterloo and City line timetables - Issue A1
LUL G-073 2011
Electrical Guidance Document - Issue A2
LUL S1171 2016
All Plant - Acceptance, Use and Maintenance - Issue A2
LUL S1094 2016
Heavy Duty Metro Type Escalators and Moving Walks - Issue A6
LUL R0098 2012
Guidance and material for giving tool box talks - Issue 1
LUL G0115 2014
Civil Engineering Competence Management System Framework - Issue A2