TOTAL GS EP EXP 757 2019
Design of an Operator Training Simulator
TOTAL GS EP EXP 501 2015
EQUIPMENT AND PIPING NUMBERING
TOTAL GS EP EXP 407 2018
IDENTIFICATION OF SAFETY CRITICAL ELEMENTS
TOTAL GS EP EXP 405 2017
STANDARD RELIABILITY DATA REPORT
TOTAL GS EP EXP 403 2019
PRODUCTION AVAILABILITY STUDIES OF OIL AND GAS FACILITIES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP EXP 217 2015
REQUIREMENTS TO VENDORS SUPPLIERS AND EPC'S FOR SPARE PARTS
TOTAL GS EP EXP 213 2017
MINIMUM MAINTENANCE REQUIREMENTS
TOTAL GS EP EXP 207 2017
INSTALLATION DESCRIPTION STRUCTURE
TOTAL GS EP EXP 203 2015
MAINTENANCE AND INSPECTION DOCUMENTATION PREPARATION DURING PROJECT PHASE
Hot Products
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP STR 401 2018
LOADOUT, SEAFASTENING, TRANSPORTATION AND INSTALLATION OF OFFSHORE STRUCTURES