TOTAL GS EP ENV 270 2015
Deep well disposal
TOTAL GS EP ENV 120 2019
Environmental impact assessment of E&P activities
TOTAL GS EP ENV 112 2017
Environmental Baseline and Monitoring Studies: Offshore and Nearshore Sites
TOTAL GS EP ENV 111 2015
Environmental Baseline and Monitoring Studies: Onshore Sites
TOTAL GS EP ENV 055 2016
Preliminary assessment of environmental and health risks related to chronic emissions on operated sites
TOTAL GS EP ENV 011 2015
Environmental specification for onshore pipeline construction
TOTAL GS EP ENV 001 2015
Environmental requirements for projects design and E&P activities
TOTAL GS EP ECP 107 2015
Energy Efficiency calculations
TOTAL GS EP ECP 105 2017
PROCESS DOCUMENTS TO BE PREPARED DURING ENGINEERING PHASE
TOTAL GS EP ECP 103 2017
PROCESS SIZING CRITERIA
Hot Products
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP STR 653 2016
F(P)SO - HULL FABRICATION REQUIREMENTS