TOTAL GS EP EXP 201 2019
OPERATIONS PREPARATION DURING PROJECT - MAINTAINABILITY & INSPECTABILITY CRITERIA
TOTAL GS EP EXP 159 2015
PIPELINE MANAGEMENT SYSTEM
TOTAL GS EP EXP 153 2019
REQUIREMENTS FOR PRODUCTION OPERATING MANUALS
TOTAL GS EP EXP 139 2015
Alarm Management
TOTAL GS EP EXP 137 2015
OCWR SPECIFICATION
TOTAL GS EP EXP 135 2018
FULL CONTROL OF WELLS (FCW) SPECIFICATION
TOTAL GS EP EXP 131 2015
DESIGN AND INSTALLATION OF PROCESS DATA SERVER
TOTAL GS EP EST 001 2019
Documents necessary for Cost Estimating at the end of a FEED or a Basic Engineering
TOTAL GS EP ENV 501 2015
GIS deliverables for HSE
TOTAL GS EP ENV 421 2015
Landfill design and operation for E&P sites
Hot Products
TOTAL GS EP STR 301 2018
FABRICATION OF OFFSHORE STEEL STRUCTURES
TOTAL GS EP EXP 311 2019
PLANT INTEGRITY - MINIMUM INSPECTION REQUIREMENTS
TOTAL GS EP PVV 772 2008
THERMAL INSULATION (COLD SERVICE)
TOTAL GS EP PLR 401 2019
INSTALLATION OF SUBMARINE PIPELINES
TOTAL GS EP PVV 821 2016
Piping and Pressure vessel equipment specification for Rotating Machines Packages
TOTAL GS EP PLR 425 2015
Site welding of carbon steel pipelines (sweet and sour service, onshore and offshore) according to API STD 1104
TOTAL GS EP MEC 034 2019
Rotating Machine Package Specification _ Process Gas Screw Compressor
TOTAL GS EP CIV 403 2007
TEMPORARY CONSTRUCTION CAMPS AND ASSOCIATED FACILITIES (ONSHORE)
TOTAL GS EP PLR 100 2019
SUBMARINE PIPELINE SYSTEMS
TOTAL GS EP COR 352 2012
INTERNAL PROTECTION OF EQUIPMENT BY PAINTING
TOTAL GS EP MEC 020 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOPUMP
TOTAL GS EP SAF 041 2012
TECHNOLOGICAL RISK ASSESSMENT METHODOLOGY
TOTAL GS EP PVV 771 2009
THERMAL INSULATION (HOT SERVICE)
TOTAL GS EP STR 652 2016
F(P)SO - STEEL HULL DESIGN REQUIREMENTS
TOTAL GS EP MEC 030 2019
ROTATING MACHINE PACKAGE SPECIFICATION TURBOCOMPRESSOR
TOTAL GS EP STR 201 2018
MATERIALS FOR OFFSHORE STEEL STRUCTURES
TOTAL GS EP MEC 031 2019
ROTATING MACHINE PACKAGE SPECIFICATION MOTOCOMPRESSOR
TOTAL GS EP TEC 260 2012
HIPS Design, Implementation and Life cycle
TOTAL GS EP STR 632 2018
Shallow Water CALM buoy
TOTAL GS EP STR 653 2016
F(P)SO - HULL FABRICATION REQUIREMENTS