Commissioning of electrical, instrumentation and control systems in the process industry. Specific phases and milestones. | Status: Current, Work in hand
description
1 Scope
This International Standard defines specific phases and milestones (see Figure 1) in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the “completion-of-erection” milestone of the project and prior to the “acceptance-of-the-plant” phase by the owner. Such activities need to be adapted for each type of process/plant concerned.
NOTE This standard assumes that the “acceptance-of-the-plant” milestone will occur after the performance test. If there is a reduced scope, this document should be adapted accordingly.
Figure 1 — Definition of phases and milestonesNOTE Construction and precommissioning activities could be overlapping.
For application in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice (GAMP)), definitions and stipulations should apply in accordance with existing standards, for example, for GMP Compliance 21 CFR (FDA) and the Standard Operating Procedure of the European Medicines Agency (SOP/INSP/2003).
Details
Publisher
BS
File size
1.62 MB
Pages
40
Format
PDF
Publication date
2012-05-31
ISBN-13
978-0-580-81737-3
ISBN-13 plain
9780580817373
ISBN-10
0580817373