loading preview...
summary
Building automation and control systems (BACS). Hardware | Status: Superseded, Withdrawn
description
1 Scope
This part of the standard specifies the requirements for the hardware to perform the tasks within a BACS. It provides the terms, definitions, and abbreviations for the understanding of Part 2 and Part 3.
Part 2 relates only to physical items/devices, i.e.:
- — operator stations and other human system interfacedevices;
- — devices for management functions;
- — controldevices, automation stations and application specific controllers;
- — field devices and their interfaces;
- — cabling and interconnection of devices;
- — engineering and commissioning tools.
Details
Publisher
BS
File size
918.65 KB
Pages
68
Format
PDF
Publication date
2004-08-11
ISBN-13
978-0-580-44253-7
ISBN-13 plain
9780580442537
ISBN-10
0580442535